P1512161 R0
33
Figure 22.
Lock the Hopper Spring
Install the Hopper Cloth
1. Slide the tubes (1, 2) into the hopper cloth (4).
2. Connect the front corners with the slip-on rail fittings (3). Orient the fittings so that the Allen screws are
facing down. See
.
Table 8.
Components for Installing the Hopper Cloth onto the Conveyor
Item
Description
Quantity
1
1/2" Pipe Sch 80 (Side)
2
2
1/2" Pipe Sch 80 (Front)
1
3
1/2" Slip-on Rail Fittings
2
4
Hopper Cloth
1
5
1/4" x 1-1/4" Elevator Bolt
20
6
1/4" Nut
20
7
Split Loom (length in feet)
19
SWING AWAY CONVEYOR – PORTABLE GRAIN BELT CONVEYOR