DD+DIS155.11E
Controls, Connections, and Setup Procedures
DOCUMENT CONTROL NOTE:
The controlled version of this document is available from the Agfa HealthCare Library. Any printed copy of this document is uncontrolled.
1
Introduction
IMPORTANT:
This document describes the installation and configuration of the digitizer including the
NX workstation with the help of the Quick Installation Guide (part of delivery) and the
CR 10-X / CR 12-X configuration wizard.
For installation without using the CR 10-X / CR 12-X configuration wizard refer to the
appendix, section 5.
REQUIRED TOOLS
The required tools are part of delivery.
REQUIRED TIME:
The complete installation of the digitizer including installation and configuration of the
workstation takes approximately 1 hour.
REQUIRED DOCUMENTS
Chapter 4 of the corresponding NX Workstation version in the Agfa HealthCare Library:
Computed Radiography > CR Workstation Software
NOTE:
The
Installation Checklist
in section 6 of this chapter gives an overview of all steps
of the digitizer installation and guides through the complete installation process.
2
Installation Preparation
Preparing the installation is split up into the following steps:
#
Task
Section
1
Check the installation site prerequisites.
2 Unpack
the
digitizer.
3
Unpack the workstation and monitor.
4
Check the shipment completeness.
Edition 1, Revision 4 CR 10-X / CR Reader / CR 12-X / CR Advanced Reader
Chapter 1 / Page 4 of 47
03-2013
Type 5151 / 100 / 110 / 200 / 210
Agfa Company Confidential