![AGCO Massey Ferguson 8516 Workshop Service Manual Download Page 22](http://html1.mh-extra.com/html/agco/massey-ferguson-8516/massey-ferguson-8516_workshop-service-manual_2866430022.webp)
4283405M1
01-17
Field Operations and Adjustments
Remote Hydraulic Valve Requirements
Three remote valves are required:
1.
One valve controls the frame lift/lower circuit.
2.
A second valve controls the tongue
height/marker/fold circuits.
3.
A third valve will be needed for hydraulic drive and
singulation blowers if the PTO pump is not used.
Minimum available tractor system pressure must be
15,502 kPa (2250 psi).
Tractor Drawbar
Adjust tractor drawbar to between 36 cm (14 in) and 51
cm (20 in) off the ground and position so hitch pin hole is
36 cm (14 in) from the end of the PTO shaft.
IMPORTANT: Drawbar must be in shortest possible
position.
IMPORTANT: Tractor must be equipped with heavy duty
drawbar option from tractor manufacturer.
Tractor PTO
The planter hydraulic pump requires a 1000 rpm tractor
PTO shaft of either size:
21-spline, 1-3/8 inch diameter
20-spline, 1-3/4 inch diameter
Tire Inflation
Inflate tires as recommended in tractor operator’s manual.
Front Weights
Install as many weights as required for front end stability
when planter is folded. Also refer to the tractor operator
manual.
Electrical Requirements
The tractor electrical system must provide 12 volts D.C. to
operate the seed monitor, highway lighting system, frame
fold control system, and hydraulic seed drive controller.
IMPORTANT: Connect electrical equipment only to 12
volts DC.
The transport lighting system is connected to the tractor
with a standard 7-pin connector.
PLANTER PREPARATION
Lubrication
Lubricate the planter as required. Also, check the fluid
level in the PTO pump. Add fluid if required.
Bolt Torque
Tighten all bolts according to the chart.
Make sure all bolts, nuts, and screws are tight and all
cotter pins are spread.
Tire Inflation
See Specifications for the correct tire pressure.
Markers
Adjust markers to correct length.
Chains
Make sure all drive chains are installed with the proper
tension, alignment, and lubrication.
Seed Discs
Install the correct seed discs in all of the metering units.
Adjust the seed gates as needed.
Hydraulic Seeding Monitor
Program the ISOBUS planter controller for the crop to be
planted. Make sure the radar devise is in the correct
position.
PLANTER CONTROLS
Mount the ISOBUS planter controller console in suitable
cab location. Connect the input leads of the monitor to the
12 VDC battery terminals.
NOTE: The ISOBUS planter controller console does not
have to be mounted on the level to operate
properly.
For convenience:
•
Mount implement switch on lever controlling planter
raise-lower hydraulic circuit.
•
Mount frame control box where folding and unfolding
procedures can be observed while using the box.
NOTE: The dealer must have installed all electrical
controls in the tractor cab.
Route the output wire harnesses to the rear of the tractor.
Summary of Contents for Massey Ferguson 8516
Page 5: ...01 iv 4283405M1 Contents NOTES Find manuals at https best manuals com...
Page 13: ...Safety 01 8 4283405M1 NOTES...
Page 19: ...01 14 4283405M1 Installation Instructions NOTES...
Page 38: ...4283405M1 01 33 Field Operations and Adjustments WHEAT PLANTING RATES FIG 22...
Page 41: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com...