![AGCO LELY ATTIS PT 130 Operator'S Manual Download Page 63](http://html1.mh-extra.com/html/agco/lely-attis-pt-130/lely-attis-pt-130_operators-manual_2866428063.webp)
4.2 Preventative maintenance schedule
50 hours 100
hours
Monthly After
Operation
Before
Extended
Storage
Other
X
Lubricate the bearings of the
wrapping table rollers.
X
X
Lubricate the loading arm hinges.
X
X
Lubricate the stretcher unit
gearwheels.
X
X
X
Lubricate the parking jack.
X
X
X
Lubricate the gearwheels below
the wrapping table rollers.
X
X
X
Lubricate the drive chain of the
wrapping table rollers.
X
X
Make sure that the transport
wheels are tightened to the correct
torque.
X
X
Make sure that the safety decals
have no damage. Replace if
necessary.
X
X
Examine the hydraulic system for
leaks and damage. Repair or
replace if necessary.
X
Clean the Machine.
X
Apply oil to the contour of the film
cutter.
X
After the
first five
hours of
operation
.
Make sure that all fasteners are at
the correct torque.
Every
five
years.
Replace all the hydraulic hoses on
the machine. Refer to assembly
date on the hose.
GUID-6B99D912-28DB-4A66-B110-FCEC139AB61D [V1]
4. Maintenance and lubrication
Bale Wrapper
63
4820.LE.EN01
Summary of Contents for LELY ATTIS PT 130
Page 6: ...Table of contents Bale Wrapper 4820 LE EN01...
Page 8: ...Table of contents 8 Bale Wrapper 4820 LE EN01...
Page 22: ...1 Safety 22 Bale Wrapper 4820 LE EN01...
Page 24: ...Table of contents 24 Bale Wrapper 4820 LE EN01...
Page 38: ...Table of contents 38 Bale Wrapper 4820 LE EN01...
Page 60: ...Table of contents 60 Bale Wrapper 4820 LE EN01...
Page 78: ...Table of contents 78 Bale Wrapper 4820 LE EN01...
Page 82: ...Table of contents 82 Bale Wrapper 4820 LE EN01...
Page 90: ...Table of contents 90 Bale Wrapper 4820 LE EN01...
Page 94: ...7 Quick reference charts 94 Bale Wrapper 4820 LE EN01...
Page 96: ...Index 96 Bale Wrapper 4820 LE EN01...
Page 97: ......
Page 98: ...AGCO Corporation 2018 All rights reserved 4820 LE EN01 English October 2018...