XTE X2 SQUAT RACK
ASSEMBLY INSTRUCTIONS
Page 1: ...XTE X2 SQUAT RACK ASSEMBLY INSTRUCTIONS ...
Page 2: ...OF MATERIALS Left Leg 1x Right Leg 1x Bottom Cross Beam 1x Upright Tube 2x Weight Storage Peg 2x Pullup Bar 1x Other Hardware Included M12 x 100 Bolt 16x Hex Nut 1 2x M12 Washer 32x J Cup 2x M12 Lock Nut 16x ...
Page 3: ...st step in assembling your squat rack is to attach the legs of the squat stand to the cross beam See the image below It s much easier to connect the uprights to the legs once they are attached to the cross beam ...
Page 4: ...t on the left leg and affix it with the 4 bolts as shown above Once the upright is secure you can also attach the weight storage peg through the 1 hole directly above the leg Use the 1 hex nut to secure it Repeat this for the right leg ...
Page 5: ...t rack is to attach the pullup bar at the top of the uprights See the above image for attachment procedure 2 Bolts are required for each side Note the height of the pullup bar is adjustable The image above is just one possible configuration ...