Commissioning
20
Before starting up commissioning at site, please make sure below procedures
and requirements are fully meet.
· Mounting location is meet the requirements.
· All of the electrical wiring is firmly connected, including PV wiring, Grid wiring
and Earth wiring.
· The inverter setting has been finished accordingly to local standards or
regulations.
Commissioning Procedures
· Turn on the AC switch between inverter output and the public grid;
· Turn on the DC switch on the inverter;
· Turn on the PV switch of the system.
5.Commissioning
UP
DOWN
ESC
ENT
RUN
FAULT
GRID
POWER
FAULT
Red LED
Green LED
Green LED
GRID
Green LED
RUN
POWER
LED Indication
On
Off
Green
GRID
Normal grid connection
Non grid
Sign
Color
Explanation
POWER
Green
On
Off
On
Off
Green
Power On
No Power
Inverter is feeding power
Inverter is not feeding power at the moment
On
Off
Red
FAULT
Fault occurred
No fault
RUN
Power