Operation
16
4.Operation
4.1 Control Panel
IItteem
mss
N
Noo..
IItteem
mss
N
Noo..
1
2
3
4
5
6
LCD Display
GRID
LED Indicator
POWER
LED Indicator
FAULT
LED Indicator
DOWN
Touch Button
ESC
Touch Button
UP
Touch Button
ENT
Touch Button
RUN
LED Indicator
1
3
5
2
4
6
UP
DOWN
ESC
ENT
RUN
FAULT
GRID
POWER
Grid
Load
PV Inverter
Distribu�on Cabinet
L1
L1‘
L2’
L3’
L2
L3
PV Array
RS485 / WiFi / Ethernet / GPRS
Afore Smart Meter
PV Array
PV Array
Router
Cloud Server
Weather Sta�on
Energy Meter
PV Inverter
PV Inverter
Note:
The Inverter could be connected in parallel with Smart Meter,
make sure the total load power not exceed Smart Mater’s limitation.