Operation 47
4510012 - REV F – 220621
Running Product
To run product through the GEN-S Steam Heat Shrink Tunnel, follow the procedure below.
Total Time Required Before Running Product:
•
At least 20 minutes
To Run Product:
Turn the System Main Power Switch on.
Ensure that the Blowdown Valve is closed.
Open the external water supply Valve to fill the Boiler. Make sure water is flowing freely
in the Water Line.
Turn the Boiler Control Power Switch on.
Blowdown Valve
(Closed)
AFM-4510012-00038-01
AFM-4510012-00041-01
System Main Power Switch
(On)
Boiler Controller
Power Switch
(On)
Sight
Glass
Pressure
Gauge
AFM-4510012-00042-01
AFM-4510012-00052-01
Summary of Contents for STC-WSN300-2M
Page 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Page 2: ...2 Abbreviations 4510012 REV F 220621 ...
Page 8: ...8 Abbreviations 4510012 REV F 220621 ...
Page 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Page 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Page 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Page 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Page 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Page 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Page 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...