
12 Installation and Setup
Installation and Setup
General Recommendations
Material Handling
The most critical item for consistently achieving superior quality shrink applicating is
material handling. This is an area controlled by the customer and the installer. It is
imperative that adequate conveyor product guides be provided, and that they are installed
and maintained properly. Incorrect or inconsistent product handling will cause quality
problems, maintenance issues, and could lead to product damage. The customer is
responsible for maintaining proper material handling equipment.
Work Area
The GS may require cleaning from time-to-time due to environmental contaminants.
Maintenance Access
When planning the installation, allow for easy access to the tunnel so that cleanup can
be done conveniently.
Important!
Turn off power and allow tunnel to cool before doing any
cleaning/maintenance.
Summary of Contents for GS 100
Page 1: ...GS 75 100 Radial Heat Shrink Tunnel User Guide ...
Page 2: ......
Page 4: ......
Page 20: ...20 Operation Turn on FAN Switch Turn on HEATER Switch 2224 Fan Switch Heater Switch ...
Page 25: ...Operation 25 Lift unit and remove Metal Cage covering the assembly Set aside 2231 Cage ...
Page 34: ...34 Schematics Schematics Wiring Diagram GS Wiring 2225 ...
Page 35: ...Schematics 35 Exploded Diagram 2226 ...
Page 36: ...36 Schematics Exploded Diagram Fan 2239 ...
Page 37: ...Schematics 37 Inside of Power Box 2228 ...
Page 45: ......
Page 46: ......