2. PREPARATION FOR MOUNTING
2.1. To mount the Level gauge on site, the following areas should be
available:
- Free channel (tank, pipeline) section for mounting an acoustic system
(AS)
- Free space used to place structures providing protection of AS from
precipitation, wind, and solar/heat radiation
- Free area suitable for positioning BMD, SPS and CB (Communication
Block).
2.2. The Level gauge
should be transported packed in the manufacturer’s
box.
After the Level gauge has been moved to the mounting location
from a cold environment into a warm one (with ambient temperature
above zero), it shall be left to stand in the manufacturer’s box for at
least 3 hours to make sure that no condensation remains inside.
When unpacking the Level gauge, check that the delivery package
contains all items specified in the Equipment Certificate.
Summary of Contents for LV Series
Page 19: ...19 reference dimension 1 RTD 2 mount flange 3 PEP Fig A 4 61x xx0 Acoustic system ...
Page 21: ...21 Fig A 6 Mount Adaptor ...
Page 22: ...22 Fig A 7 Flange with the ring bolt installed ...
Page 23: ...23 Fig A 8 Pipe mount adaptor ...
Page 24: ...24 Fig A 9 Perforated adaptor pipe ...
Page 25: ...25 APPENDIX B Methods for mounting acoustic systems Fig B 1 Mounting AS 11x xx3 ...