![AFLOWT LV Series Installation Manual Download Page 15](http://html.mh-extra.com/html/aflowt/lv-series/lv-series_installation-manual_2864688015.webp)
15
6. DISMOUNTING
To dismount the Level gauge before dispatching for regular
calibration or repair, it is necessary to:
- Turn power off the Device
- Unscrew 6 screws fixing the Measurement Subblock to the Mount
Module from the front panel side
- Disconnect signal cables connecting BMD with external devices from
the terminal blocks
- Screw 6 screws fixing the Measurement Subblock to the Mount Module
- Remove BMD
- Unscrew 4 screws on the cover of the Communication Block
- Disconnect all CB cables from the terminal blocks
- Remove AS together with the rigidly terminated cable.
When the Level gauge (BMD, AS) is dispatched for calibration or
repair, the acoustic systems should be cleaned off sediments, residue,
scale, etc.
Summary of Contents for LV Series
Page 19: ...19 reference dimension 1 RTD 2 mount flange 3 PEP Fig A 4 61x xx0 Acoustic system ...
Page 21: ...21 Fig A 6 Mount Adaptor ...
Page 22: ...22 Fig A 7 Flange with the ring bolt installed ...
Page 23: ...23 Fig A 8 Pipe mount adaptor ...
Page 24: ...24 Fig A 9 Perforated adaptor pipe ...
Page 25: ...25 APPENDIX B Methods for mounting acoustic systems Fig B 1 Mounting AS 11x xx3 ...