AES MINI FOUL Installation, Operating, Maintenance Download Page 1

INSTALLATION, OPERATING & 

MAINTENANCE GUIDELINES

Automated Environmental Systems Ltd.,  

Unit 1,  1 Wimbledon Avenue,  

Brandon,   

Suffolk,   

IP27 0NZ 

01842 819130

[email protected]

MINI FOUL Pumping Station

© Automated Environmental Systems Ltd. February 2022

Summary of Contents for MINI FOUL

Page 1: ...E GUIDELINES Automated Environmental Systems Ltd Unit 1 1 Wimbledon Avenue Brandon Suffolk IP27 0NZ 01842 819130 service automatedenvironmentalsystems co uk MINI FOUL Pumping Station Automated Environ...

Page 2: ...PUMPING STATION IS DESIGNED TO HANDLE EFFLUENT The following items must be kept out of the pump chamber Baby Wipes Nappies Cleaning Wipes Sanitary Towels THESE TYPES OF PRODUCTS ARE LIKELY TO BLOCK TH...

Page 3: ...the technologies applied to the equipment supplied Whilst every care has been taken during the compilation of this manual to ensure that the information provided is correct no liability can be accepte...

Page 4: ...Confined Space Entry certification should enter a pump chamber and then only if there is a second qualified person equipped with required safety equipment supervising The following checklist although...

Page 5: ...re is relieved DANGER HIGH VOLTAGE Control boxes contain high voltage live wiring and terminals Entry of control boxes is not permitted except by qualified electrical personnel only ensure controller...

Page 6: ...A CONTINUOUS LAYER OF PLASTIC SHEETING PRIOR TO INSTALLATION As with all site work the dangers of working with water and electricity pose severe threats to health if obvious and fundamental precautio...

Page 7: ...order to be protected from any external force the chamber should be completely surrounded by concrete The concrete surrounding the chamber should be of suitable thickness usually a minimum of 150mm a...

Page 8: ...uld concrete be poured directly onto the chamber Attempting to pour too much concrete at once will result in the chamber floating or particularly above the halfway point damage to the chamber due to e...

Page 9: ...l sand debris etc removed from the chamber If vehicular traffic will be passing over the chamber it is ESSENTIAL that the cover slab is constructed so that there is NO DIRECT LOAD on the chamber an ac...

Page 10: ...getting no flow it is most likely due to an airlock in the pipe To ensure that the tank isn t emptied too much and air is sucked up reduce the length of the float cable through the side clip to have t...

Page 11: ...les are to be connected using only two of the cable cores the colour coding can be found inside the instructions manual provided with the float s The core that isn t used should be cut off and isolate...

Page 12: ...hole of the tank 2 The pump is to be situated at the bottom of the tank attached to the flexible hose using the hose tail bend and clips provided excess hose should be removed as required on site 3 T...

Page 13: ...the pump is checked every six to twelve months to ensure that the oil chamber is free from contamination as per the manufacturer s instructions and to check the pump for any blockages and to clean aw...

Page 14: ...or cloth Plastic objects Sand rock stones or other debris Failure to follow these guidelines may invalidate your warranty in which case any service visits and replacement pumps parts as a result of m...