RN200 Mono Software User Manual
19
6
System Power On
1.
Connect the power cord and turn the instrument switch to "Internal Instrument."
2.
Press the power button; the button should turn green.
3.
The signal indicator will flashes yellow, indicating the controlling and testing module is
booting up. After about 30 seconds, the indicator will turn green, indicating that the
system has started up successfully and is ready to be used.