![Advanced Poly-Packaging T-200 Operation Manual Download Page 8](http://html.mh-extra.com/html/advanced-poly-packaging/t-200/t-200_operation-manual_2856141008.webp)
•
CAUTION: Use only APPI approved parts/replacement components.
•
CAUTION: Do not modify or otherwise alter machine operation, components or design.
Potential injuries:
•
CAUTION: Cuts or minor abrasions from sharp objects, including not but limited to sheet
metal fingers, screws, edges
•
CAUTION: Crush injuries from pinch points, including but not limited to bag rolls shaft,
pinch rollers, funnel assembly or seal area.
•
CAUTION: Back, arm, leg or other muscle strain from lifting rolls of bags, boxes of bags or
product.
•
CAUTION: Muscle strain from loading bags, separating bags or other repetitive functions
•
CAUTION: Electrical shock if unit is not turned off and unplugged prior to removing guards
or covers
•
CAUTION: Minor burns form exposure to heater bar
•
CAUTION: Eye injury from not wearing eye protection during loading of product or sealing
of bags.
1.8
Specifications
Dimensions:
19.25” wide x 14.675” deep x 21” tall
Weight:
50 lbs.
Air:
50 psi
Electric:
115V/60Hz or 220V/50Hz
Bag sizes:
2 x 2 up to 11 x 16
Product pass through area:
approx. 2.75”
1.9
Unpacking & Setup
The T-200 is shipped completely assembled and in a carton. Remove all tape, banding or packing
materials that secure the machine. To ensure the highest production possible, consider product flow to the
bagger and packaged product flow away from the bagger when positioning the bagger into your
packaging areas.
1.10
Operating Environment
When you choose a location for installation, make sure the area is free of excess dust, dirt and moisture.
Operating room temperature should range from 50°F to 100°F (10°C to 87.77°C).
7
Summary of Contents for T-200
Page 10: ...This page intentionally left blank 9 ...
Page 15: ...T 200 Threading Diagram Figure 2 1 14 ...
Page 16: ...This page intentionally left blank 15 ...
Page 27: ...T 200 Electronics Assembly PN TA T8 1000 26 ...
Page 29: ...T 200 Heater Bar Assembly PN TA T8 2000 28 ...
Page 32: ...T 200 Main Frame Assembly PN TA T8 4000 31 ...
Page 34: ...F T 200 Pneumatic Layout Dwg NO T 200 PNE 33 ...
Page 35: ...G T 200 Electrical Layout 34 ...