INSTALLATION INSTRUCTIONS
The Double-Sided IP Display ships with ferrite, and comes configured for wall mount installation. If concerned with line
performance, wrap CAT5 or CAT6 Ethernet cable around ferrite once and clamp shut.
Wall Mount Installation
1.
Use included template or bracket for marking the wall
mounting locations.
2.
Con
nect network coupler on the device to a POE switch or
POE injector using a separate network cable (CAT5 or better).
3.
Attach bracket to wall using mounting hardware appropriate
to the facility building materials.
Ceiling Mount Installation
1.
Detach network cable
coupler from internal
network cable.
2.
Remove the two hex
head bolts securing
the mounting bracket
to the main enclosure,
and remove bracket.
3.
Remove the two
screws holding the flat
plate to the top of the
enclosure. Push
network cable into
device and relocate this plate to the side opening using
the same two screws.
4.
Relocate bracket to
the top of the
enclosure using the
two hex head bolts
removed in step 2.
5.
Remove four side
screws from face A of
the device as shown.
6.
Remove the stainless-
steel baffle from
enclosure and lay face
down in front of
enclosure, being
careful to avoid
straining any attached wires.
7.
Route network cable
through the top
bracket. Reattach the
network cable
coupler.
8.
Reversing steps 5 and 6, reattach the stainless-steel
baffle being careful to avoid pinching any wires.
Secure with four side screws removed in step 5.
9.
Connect network coupler on the device to a network
cable (CAT5 or better).
10.
Attach
bracket to
load bearing
ceiling
supports
using
mounting
hardware
appropriate to the facility building materials.
Flat Plate Screws
Hex Head Bolts
Hex Head Bolts
FACE A
(side plate on the right)
Side Screws
Hole
Spacing 4"