Drywall with Adjustable Frame System (AFS)
Classification
E120 (ve i↔o)S
Pre Installation Notes
1.
Ensure that the damper is kept in a clean dry environment.
2.
Remove all packaging and any transit ties and check that the damper
frame and blades are clean and free of any freight matter.
3.
Examine the assembly for distortion, denting or surface damage which
could inhibit the operation of the damper.
4.
Operate the damper blades in the appropriate mounting position. It is
important that the blades operate freely and without undue pressure
being applied.
Installation Procedure
1.
The Drywall which will consist of two layers of 15mm plasterboard each
side of the steel studwork with a 50mm Rockwall insulation. The opening
will be a letterbox construction with overlapping layers of plasterboard
with an opening clearance of 25mm (min) – 100mm (max) all around the damper casing (barrier contractor).
2.
Two M10 drop rods shall be fitted each side of the wall fixed by steel anchors into the slab or soffit above.
3.
The access side of the damper (denoted by extended spigot with actuator) must always be installed flush with the surface
of the drywall wall.
4.
The gap between the damper and the wall opening ill need filling in with at least 2 layers of 140 kg/m³ 50mm Firebatt cut
to interference fit pushed in place.
5.
The ductwork connecting to the damper spigots must overlap by 40mm, leaving a 10mm clearance for any duct expansion
in a fire situation.
6.
All ductwork connections must be sealed with an approved ductwork sealer, and fixed with low resistance fixings such as
aluminium alloy rivets or nylon bolts.
7.
All connecting ductwork must be independently supported with I metre of the connections.