Advanced Air UK Ltd
Burrell Way
Thetford
Norfolk IP24 3QU
Tel: 01842 765657
Email: [email protected]
2530 CE Series
Smoke Fire Damper
Due to continuous product development Advanced
(U.K.) Ltd reserves the right to change any
information without prior notice
Date
Issue
Sheet
Spec Number
April 2018
C
29 of 34
TS2530CE-01
G:\PRODUCTS\DMP - 2500 Series\05 Product Data\2530\Tech Sub\2530CE\TS2530CE-01 Technical Sub Rev C.docx
Blockwork wall with Adjustable Frame System (AFS)
Classification
E120 (ve i↔o)S
Pre Installation Notes
1.
Ensure that the damper is kept in a clean dry environment.
2.
Remove all packaging and any transit ties and check that the damper frame
and blades are clean and free of any freight matter.
3.
Examine the assembly for distortion, denting or surface damage which could
inhibit the operation of the damper.
4.
Operate the damper blades in the appropriate mounting position. It is
important that the blades operate freely and without undue pressure being
applied.
Installation Procedure
1.
Vertical builders work barrier to have an appropriately sized lintel and opening
clearance for the damper and Firebatt
2.
The opening in the wall must be cleaned, free of duct and any other contaminants which could impair the acrylic sealant.
A clearance gap of 25mm (min) 100mm (max) for the Firebatt must be maintained around the damper (barrier
contractor)
3.
The dampers shall be mounted so that the supported side of the damper is flush with the wall opening. It shall be hung by
M10 drop rods wising the slotted rail and bolted tight to steel anchors in the slab or soffit above.
4.
The gap between the damper and the wall opening will need filling in with 3 layers of 140 kg/m³ 50mm Firebatt cut to
interference fit and pushed in place.
5.
All joints and gaps shall be sealed using intumescent acrylic sealant.
6.
The ductwork connecting to the damper spigots mu must overlap by 40mm, leaving a 10mm clearance for any duct
expansion in a fire situation.
7.
All ductwork connections must be sealed with an approved ductwork sealer, and fixed with low resistance fixings such as
aluminium alloy rivets or nylon bolts.
8.
All connecting ductwork must be independently supported within 1m of the connections.
9.
An access cover should be fitted on the appropriate side of the barrier to enable inspections and maintenance work