Chapter 10 Commissioning the Shelves
Installation and Commissioning Manual
351
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Provisioning Cable Connection
The FSP 3000R7 equipment is interconnected by cables. These physical con-
nections can
be registered in the NE database. The user must therefore enter
the access identifier (AID) addresses for the connections of all cables. For
details on provisioning equipment see the
Provisioning and Operations Manual
.
For users of third party equipment:
Make sure you have the installation information and cabling plan available.
Procedure
Step 1
Identify the first cable described in the cabling plan. Make a note of
the starting and ending modules and ports.
Step 2
Use one of the management tools (i.e. Craft Console, Web Console),
select the module that the cabling plan lists as the starting point for
the cable.
Step 3
Go to the Config tab.
Step 4
To create a physical connection for the module, select Connections...
and in the following window select Create Connection... Refer to the
Provisioning and Operations Manual, Chapter 2
for further details.
Step 5
Enter the AID addresses for the starting and ending points of the
cable.
Step 6
Select from the drop-down list Type of Connection to specify if it is a
two-way or one-way connection, if relevant. For more information on
two-way/one-way connections, refer to the
Provisioning and Opera-
tions Manual, Chapter 2
.
Step 7
Select [Apply] to save your settings.
Step 8
Identify the next cable described in the cabling plan. Make a note of
the starting and ending modules and ports.
Step 9
Repeat Steps 2 through 7.
P
S
Note
Cable provisioning is intended for management systems (e.g.
Siemens TNMS) only. It is itself not relevant for the FSP 3000R7
equipment’s operation.
P
S
Note
The Craft Console is used for first time installation and commissioning
via a serial connection. For information on management tools, see