
Chapter 6 Installing System Modules
Installation and Commissioning Manual
247
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Step 12 Check the corresponding the channel module port LED.
If this LED is off, the inserted pluggable transceiver needs still to be
assigned using the management software (only when installed the
first time).
If this LED is yellow, it indicates that the port is equipped again and
the inserted transceiver module is already assigned, but there is no
traffic (only when replacing a transceiver)
If this LED is flashing red, the inserted pluggable transceiver is the
wrong type, or it is not approved by ADVA Optical Networking, thus
not accepted by the system.
For more information about the channel module port LEDs, refer to
the
Maintenance and Troubleshooting Manual
.
If the pluggable transceiver is not accepted by the system or does not
respond, remove it again from the cage. Install a new one of the cor-
rect type or reinsert the dust plug into the empty cage.
Step 13 If you have finished with your work, mount the front cover to the shelf
as described in
“Mounting the SH7HU or SH9HU Front Cover” on
.
Step 14 Detach the wrist strap from your wrist, disconnect the earthing cable
from the ESD grounding point on the shelf (if available) or the rack
and lay the earthing cable aside.
Step 15 Store the pluggable transceiver and the resealable containers with
the dust plugs, dust covers and the protective caps for future use in a
safe place.
Should you have any difficulty performing this procedure, contact ADVA Optical
Networking’s
.
End of Procedure
Repeat this procedure for each SFP, SFP+ or XFP transceiver to be installed.
Installing a CFP Transceiver
See the
section above before you install any CFP transceiver
modules. The following description is applicable to both
CFP/112G/LR10R/SM/LC and CFP/112G/LR4/SM/LC modules provided by
ADVA Optical Networking. In this procedure, these modules are referred to as
CFP transceivers.
Equipment Required
Before starting the procedure, ensure the following equipment is available:
•
CFP transceiver module to be installed
•
ESD-preventive wrist strap or other personal grounding device
•
Suitable grounded surface or an antistatic mat for placing the CFP trans-
ceiver