
Unpacking a Module-Integrated DCM Shelf
104
Installation and Commissioning Manual
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Unpacking a Module-Integrated DCM Shelf
This section describes how to unpack a Module-Integrated DCM Shelf
(DCF1HU-P).
Each DCF1HU-P shipment consists of one equipment pack. The DCF1HU-P
Shelf is packed in a unit box made of styrofoam. The unit box and the accesso-
ries are packed in a cardboard box (master box) for shipping.
Tools Required
You need utility scissors or a utility knife to open the cardboard box. Suitable
grounded surface or an anti-static mat for placing the shelf must be available.
Procedure
To unpack a DCF1HU-P perform the following steps:
Step 1
Move the cardboard box with the DCF1HU-P to the location where the
shelf will be installed.
Step 2
Open the cardboard box on the upper side only as follows:
a) Using a utility knife or scissors, cut open the adhesive tape. Pay
attention not to damage the flaps.
b) Lift the flaps toward you so that the box is opened completely.
Step 3
Remove the unit box (styrofoam) with the shelf and put it on a
grounded surface or an anti-static mat.
Step 4
Remove everything else from the cardboard box.
CAUTION
Only Service Personnel are allowed to unpack a DCF1HU-P.
P
S
Note
Review the guidelines provided in
before you
open the shipping box and unpack a DCF1HU-P.
Risk of damage due to electrostatic discharge!
Keep the DCF1HU-P in its box until you are ready to inspect it.