Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual
20
64192MB3K2LX-1B
Power Turn-up
After power is available to the cabinet from a commercial power source and the cabinet has
been wired for power in accordance with “Chapter 3, AC Power” in Emerson document 631-
205-071, the cabinet is ready for power turn-up. Refer to “Chapter 4, Turning Up AC Power”
Emerson document 631-205-071.
Turn-up and Test Rectifier
The Valere Power System/Rectifier is the primary power source for all cabinet DC electrical
loads. The Valere Power System/Rectifier, including the controller module, has been factory
installed and wired and is ready for rectifier installation. This is a modular power system
requiring three 10 amp load sharing rectifier modules providing redundant capability. The
system can operate with one failed or removed rectifier. Rectifier modules can be hot-swapped.
Following customer installation of the rectifiers, conduct the following turn-up test. For
specific information, refer to “Section 5, Test and Turn-Up” in the Valere
Compact DC Power
System
document.
WARNING
Prior to bringing power into the cabinet ensure that all protective
covers and shields are securely in place and that no live wiring will
be exposed.
To turn up the Valere Power System/Rectifier, complete the following steps:
1. Ensure that all DC breakers are
OFF
before applying AC power to the PS/R. DC circuit
breakers are located in the Valere DC distribution module.
2. Provide office AC power to the Hi-Cap RT Solution.
3. Switch the main circuit breaker in the AC panel to the
ON
position.
4. Switch the breakers that control power to the rectifier to the
ON
position.
5. Verify bus voltage on the shelf (–54 VDC) by probing the output load terminals.
Valere Power System
The Valere Power System/Rectifier was factory provisioned for this application. Following
successful power turnup of the Valere Power System/Rectifier the unit is ready for operation.
For other provisioning details refer to the Valere document Application Bulletin No. 201.
Battery Activation
Power up the rectifier by first turning
ON
the main AC breaker in the AC Load Center. Then
turn
ON
the breakers that supply power to the rectifier shelf. Finally turn
ON
the breaker that
connects the battery to the DC power circuit. Refer to the Valere Power System/Rectifier
operating instructions for LED indication of battery charge status.
The Valere Power System/Rectifier includes a battery charge temperature compensation
module; therefore the output voltage must be adjusted to the sense calibration voltage of the
temperature compensation module. Refer to the Valere Power System/Rectifier operating
instructions for detailed procedures.