background image

Quick Start

D

ESCRIPTION

The ADTRAN

®

 422G Gfast Bridge Customer Premises 

Equipment (CPE) is a single-port unit with vectoring that allows 
delivery of ultra-fast broadband speeds to residential customers 
over existing copper wires. The 422G CPE is used to provide a 
Gigabit Ethernet LAN interface to the end user.

Figure 1

 shows the front and back of the 422G CPE.

Figure 1. ADTRAN 422G CPE

The following table lists the features of the 422G CPE illustrated in 

Figure 1

.

Power Connector

The power feed is +12 VDC from the included AC/DC adapter. 
The adapter plugs into the 

POWER

 connector. The total power 

consumption is less than 10 watts.

RJ-45 LAN Interface

The 422G CPE supports data service through one 10/100/
1000BASE-T Ethernet interface via an RJ-45 style connector.

RJ-11 Gfast Interface

The RJ-11 Gfast interface is used to connect the 422G CPE to a 
wall phone jack. This provides Gfast capabilities using the existing 
phone lines.

Number Feature

1

LEDs

2

Gfast RJ-11 interface

3

Reset button

4

Ethernet 10/100/1000Base-T RJ-45 interface (LAN)

5

12 V power connection (Power)

1

2

4

3

5

Front

Back   

Reset Button

To reset (reboot) the unit, insert a small pin or the end of a paper 
clip into the 

RESET

 opening and hold the button down for 10 

seconds. The 422G CPE will automatically download the latest 
provisioning after the reset process has completed.

I

NSTALLATION

Before installing the 422G CPE, inspect it for damage. If damage 
has occurred during shipping, file a claim with the carrier and then 
contact ADTRAN. For more information, refer to the warranty.

Installation Guidelines

Follow the guidelines below when installing the 422G CPE.

Read all warnings and cautions in the 

422G Gfast Bridge CPE

Safety and Regulatory Notice

 before installing the 422G CPE.

Do not locate the 422G CPE in direct sunlight or next to any
thermal obstructions or source of moisture.

Do not mount the 422G CPE higher than 9.8 ft (3 m) from the
floor.

Locate the 422G CPE near the service entrance and near a
power location.

Installation Overview

Installation of the 422G CPE consists of the following steps:

“Step 1: Position the 422G CPE”

“Step 2: Connect the Ethernet Cable”

“Step 3: Connect the Gfast RJ-11”

“Step 4: Connect 12 VDC Power”

Installation Steps

Step 1: Position the 422G CPE

The 422G CPE can either be mounted on a wall or placed on a 
desktop.

Gfast

422G CPE

Gfast Bridge CPE

June 2019

611321713F22-13B

P/N: 11321713F22

Reviews: