Getting Started
17
MCM-204
2
Getting Started
2.1
Unpacking the MCM-204
Ensure that the following items are included in the package. If any
items are missing, contact your sales representative for assistance.
MCM-204
DIN rail mount kit with 2x flat head screws
Temperature sensor with 3 meter cable
Quick Start Guide
Optional accessories (if applicable):
Wall mount kit with 4x pan head screws
40W AC-DC adapter
2.2
Connecting to I/O
1 For analog input, plug in the accelerometer with a BNC
type connector.
2. For digital input or output, insert the signal wires into the
terminal block.
3. Use a CAT 5 type Ethernet cable to connect a host PC to
one of the Ethernet ports on the top panel. To create a
daisy chain of multiple MCM-204 devices, use the sec-
ond Ethernet port to cascade them together. Cascading
reduces the number of ports needed to connect devices.
WARNING:
Before unpacking, check the shipping carton for any damage.
If the shipping carton and/or contents are damaged, inform
your dealer immediately. Retain the shipping carton and pack-
ing materials for inspection. Obtain authorization from your
dealer before returning any product to ADLINK.
CAUTION:
If connecting MCM-204 devices in a daisy chain, only use a
sequence configuration: do
not
use a ring configuration. A ring
configuration will cause network communications to fail.
Summary of Contents for MCM-204
Page 8: ...viii List of Figures Leading EDGE COMPUTING This page intentionally left blank ...
Page 15: ...Introduction 7 MCM 204 Figure 1 2 Top View 111 65 40 Units mm ...
Page 16: ...8 Introduction Leading EDGE COMPUTING Figure 1 3 Left Side View 111 65 126 5 Units mm ...
Page 17: ...Introduction 9 MCM 204 Figure 1 4 Right Side View 111 65 126 5 Units mm ...
Page 20: ...12 Introduction Leading EDGE COMPUTING Figure 1 7 Wall Mount Assembly ...
Page 28: ...20 Getting Started Leading EDGE COMPUTING This page intentionally left blank ...
Page 46: ...38 Web Console Leading EDGE COMPUTING This page intentionally left blank ...