Getting Started
19
MCM-100/102
2 Getting Started
2.1 Unpacking Checklist
Before unpacking, check the shipping carton for any damage. If
the shipping carton and/or contents are damaged, inform your
dealer immediately. Retain the shipping carton and packing
materials for inspection. Obtain authorization from your dealer
before returning any product to ADLINK. Ensure that the fol-
lowing items are included in the package.
MCM-100/102 unit
DIN rail brackets
Wall mounting kit
Screw pack for DIN rail, wall mounting, and storage fixing
Quick Start Guide
2.2 Connecting DC Power
Active DC power sources must comply with LPS and SELV cir-
cuits with no energy hazard, as well as the following.
IEC 60950-1:2005+A1:2009+A2: 2013
Output voltage: 6 to 36VDC
Output current: 4.2 to 0.7A minimum
Tma: 50°C min.
The DC power input connector of the MCM-100/102 utilizes V+, V-
and chassis ground pins, and accepts input voltage as shown pre-
viously.
2.3 DIN Rail Mounting
The MCM-100/102 controller is shipped with wall-mounting brack-
ets and accessory screws, with mounting procedures as follows.
1. Prepare the DIN rail mounting bracket and 2 M4-F head
screws.
WARNING:
Before providing DC power to the MCM-100/102, ensure the
voltage and polarity provided are compatible with the DC input.
Improper input voltage and/or polarity can be responsible for
system damage.
Summary of Contents for MCM-100
Page 6: ...vi Preface Leading EDGE COMPUTING This page intentionally left blank...
Page 14: ...xiv List of Tables Leading EDGE COMPUTING This page intentionally left blank...
Page 16: ...xvi List of Figures Leading EDGE COMPUTING This page intentionally left blank...
Page 34: ...18 Introduction Leading EDGE COMPUTING This page intentionally left blank...
Page 37: ...Getting Started 21 MCM 100 102 161 58 150 38 134 3 118 22 113 95 60 6...
Page 44: ...28 Getting Started Leading EDGE COMPUTING This page intentionally left blank...
Page 50: ...34 Driver Application Installation Leading EDGE COMPUTING This page intentionally left blank...
Page 64: ...48 Operation Leading EDGE COMPUTING This page intentionally left blank...
Page 87: ...BIOS Setup 71 MCM 100 102 SEMA Features Shows features supported by the SEMA version...
Page 90: ...74 BIOS Setup Leading EDGE COMPUTING Flags Shows BMC flags with exception codes...
Page 91: ...BIOS Setup 75 MCM 100 102 Power Up Lists Power Up Watchdog status...
Page 100: ...84 BIOS Setup Leading EDGE COMPUTING This page intentionally left blank...
Page 116: ...100 Important Safety Instructions Leading EDGE COMPUTING This page intentionally left blank...