background image

 

 
 

AV4IP 

User Guide 

 

 

 

 

Summary of Contents for AV4IP

Page 1: ...AV4IP User Guide...

Page 2: ...uries to any persons and direct or indirect economic loss associated with the use or reliance of any information contained within this document and or as a result of the improper unsafe insufficient a...

Page 3: ...Netherlands 3 CONTENTS General Information 4 Limited Warranty USA Only 5 Safety Guidelines 6 Maintenance Guidelines 8 Panel Overview 9 Handling and Transportation 11 Installation 13 Technical Specific...

Page 4: ...processors range from the basic and cost effective MCTRL 300 that can drive up to 1 3 million pixels 120 AV4IP panels to the advanced Novastar VX4S that can drive up to 2 6 million pixels 240 AV4IP pa...

Page 5: ...to the repair of the product or replacement thereof including parts at the sole discretion of ADJ Products LLC All products covered by this warranty were manufactured after August 15 2012 and bear id...

Page 6: ...RATION AS IT MAY BE HOT KEEP FLAMMABLE MATERIALS AWAY FROM PANEL TO MAINTAIN IP RATING INTEGRITY AND PREVENT WATER FROM ENTERING PANEL ALL UNUSED CONNECTION RUBBER CAPS MUST BE SEALED DO NOT touch pan...

Page 7: ...aking any type of power or data connections and performing any maintenance work CAUTION Read user manual carefully to ensure normal operation and lifespan of the panel CAUTION Electronics used in this...

Page 8: ...l system cannot be reversed and should therefore only be connected in original layout order 8 If the GFI Ground Fault Interrupt breaker switch trips often check the display or replace the power supply...

Page 9: ...ver card modules allowing for easy serviceability and simple repairs whilst out on the road The cover of the power supply box can be secured to protect all internal accessories and components Dimensio...

Page 10: ...AV4IP Overview Folding handle Integrated Vertical Locking Panel Connector Power Output Power Input etherCON RJ45 Integrated Horizontal Locking Panel Connector Sockets ESD Grounding Hole Connection Pl...

Page 11: ...e to avoid damaging any of the 4 corners Because these are ESD sensitive units use ESD precautions when removing the AV4IP LED Video Panels from their flight case ESD gloves protective clothing wrist...

Page 12: ...The flight case features a full foam lining with slots for each unit The case is robust so will completely protect a set of panels on the road Designed specifically for use with ADJ video panels it i...

Page 13: ...lled following all local national and country commercial electrical and construction codes and regulations Before rigging mounting a single panel or multiple interconnected panels to any metal truss s...

Page 14: ...spring loaded Note horizontal orientation of the locking tab mechanism with the lever in down and locked position 1 Align the locking tab with tab keyed connector socket 2 Squeeze panel connector to p...

Page 15: ...s with their corresponding alignment holes then push locking vertical connector up through its corresponding socket 2 With the vertical locking connector pushed up through its corresponding socket sli...

Page 16: ...ician or trained professional is required to fly the AV3RB1 Rigging Beam AV4IP LED Video Panel assembly 1 Align the vertical positional posts with their corresponding alignment holes 2 Push locking ve...

Page 17: ...IP54 Back Temporary outdoor use Out of Control Rate 0 03 Listings cETL CE FCC Class A ETL Specifications subject to change without any prior written notice FCC STATEMENT This device complies with Part...

Page 18: ...Main Power Cables IP65 True1 powerCON to Edison 15ft 4 57M TRU215 25ft 7 62M TRU230 50ft 15 24M TRU254 100ft 30 48M TRU271 1 64ft 50M TRU200 Panel to Panel Power Link Cables IP65 True1 powerCON to Tr...

Page 19: ...ADJ Products LLC Los Angeles Ca USA Kerkrade Netherlands 19 THIS PAGE IS INTENTIONALLY LEFT BLANK...

Page 20: ......

Reviews: