background image

48 INCH WALL CABINET

USER GUIDE

ADIME902-WALL-48-GRY

Summary of Contents for Viva ADIME902-WALL-48-GRY

Page 1: ...48 INCH WALL CABINET USER GUIDE ADIME902 WALL 48 GRY ...

Page 2: ...ducts and commercial research We recognize that starting and maintaining a medical practice is expensive We ll help make the process cost effective and elegant Additionally our team of specialists will ensure everything you need works as efficiently as possible so you can effectively treat your clients ...

Page 3: ...Table of Contents 2 3 4 11 17 Parts Hardware Assembling Your Wall Cabinet Hanging Your Wall Cabinet Warranty ...

Page 4: ...2 Parts A Left Panel C Middle Panel B Right Panel D Back Panel F Bottom Panel E Top Panel G Removable Shelf x2 I Center Back Rail H Top Back Rail J Bottom Back Rail L Right Door K Left Door ...

Page 5: ...n Dowel x24 Shelf Support x8 8 Handle x2 Hardware Tools Needed But Not Included Electric Screwdriver Rubber Mallet Flat Head Screwdriver Phillips Head Screwdriver Ø4x15 mm Wooden Screw x24 Ø4x30 mm Wooden Screw x2 Ø15 13 mm Cam Lock x16 Ø8 35 mm Cam Lock Bolt x16 Ø8x40 mm Wooden Dowel x24 Hardware Specifications ...

Page 6: ...l C and affix the shorter edge to the Bottom Panel F a Gently tap the Middle Panel C with a rubber mallet until flush with the Bottom Panel F G Line up the hardware installed on the Top Panel E with the other edge of the Middle Panel C a Ensure the etched channel on the Top Panel E mirrors the etched channel on Bottom Panel F b Gently tap it until the Middle Panel C and the Top Panel E are flush H...

Page 7: ...J and Top Back Rail H with a rubber mallet until flush B Lay the Left Panel A on a flat clean surface C Install six Wooden Dowels 7 and six Cam Lock Bolts 6 into three of the edges on the Left Panel A as shown D Once the hardware is secure attach your structure and push it down until it is flush with the Left Panel A E Install four Cam Locks 5 on the bottom of the Top Panel E and the Bottom Panel ...

Page 8: ...the Right Panel B install six Cam Lock Bolts 6 and six Wooden Dowels 7 C Lift the Right Panel B and line the installed hardware up with the predrilled holes on the Top Panel E Back Panel D Top Back Rail H and Bottom Back Rail J D Insert the hardware and push the Right Panel B down until it is flush with the rest of the structure E Install six Cam Locks 5 on the Top Panel E Back Panel D Top Back Ra...

Page 9: ...7 H 4 J 2x Step 5 A Take one Ø4x30 mm Wooden Screw 4 and secure it to the middle of the Top Back Rail H as pictured B Repeat the above step for the Bottom Back Rail J as shown ...

Page 10: ...ges 1 to the inside of the doors using two screws per Hinge 1 as pictured a Eight screws total will be used between the two doors C Take both Handles 8 and affix them to both doors with their accompanying screws and thread them through the predrilled holes on the doors D Secure them in place with a Philips head screwdriver Step 6 ...

Page 11: ... side of the Hinges 1 with two Ø4x15 mm Wooden Screws 2 per Hinge 1 as pictured B Insert eight Shelf Supports 3 as pictured and at your desired height C Insert both Removeable Shelves G as pictured and ensure the pegs insert into the shelves Step 7 8x 4x G G 3 2 1 ...

Page 12: ... the Hinges 1 as pictured and secure them together with one Ø4x15 mm Wooden Screws 2 per Hinge 1 a Four screws total will be used between the two doors B If your doors do not line up adjust the screws as shown Step 8 8x 2 ...

Page 13: ...rewdriver Drill Electric Screwdriver Stud Finder Tape Measure 9 mm Drill Bit Pencil Before beginning locate where exactly you want the Wall Cabinet to be installed You must find at least one stud to mount the French cleating system into Make sure you have all the necessary tools listed above prior to beginning We highly recommend using two people to ensure everything is level and properly installe...

Page 14: ...ginning B Taking your tape measure measure from the ground up 76 1 4 a Mark this measurement on the wall with a pencil b This is the height of your mounting holes C Using the mark on the wall take your 4 foot level and measure out 46 1 16 a Mark this line with a pencil going right to the left Step 1 ...

Page 15: ... to left 2 1 4 a Mark this measurement on the wall b This will be your right drill hole for Bottom Cleat B C Using your tape measure measure from right to left on your line 16 1 8 a Mark this measurement on the wall b This will be your 1st central drill hole for Bottom Cleat B D Using your tape measure measure from left to right on your line 16 1 8 a Mark this measurement on the wall b This will b...

Page 16: ...14 A Drill the four holes marked on the wall with a 9 mm drill bit at a depth of 2 75 B Insert the four Plastic Anchors 1 into the holes Step 3 1 ...

Page 17: ... B and line it up with the holes you drilled in Step 3 a Insert the four included Screws 2 into the predrilled holes on the cleat b Secure them in place with either a Philips head screwdriver or an electric screwdriver Step 4 B 2 ...

Page 18: ... A With two people lift your wall cabinet up and over the Bottom Cleat B B Slowly slide the cabinet down until the Top Cleat A 45 edge fits securely on the Bottom Cleat s B edge Step 5 33 1 4 24 24 76 1 4 ...

Page 19: ...ed to provide the Company with the following items a proof of purchase b photographs and or videos of the damage and c a written testimonial describing the defect Products shipped without prior Return Authorization and Return Authorization Number may not be accepted and the Company will not be responsible for their disposition and or cost of return to the owner The Company will not assume any resp...

Page 20: ...ADIME902 WALL 48 GRY 2023 AdirCorp adircorp com ...

Reviews: