![adept technology Cobra s350 User Manual Download Page 57](http://html1.mh-extra.com/html/adept-technology/cobra-s350/cobra-s350_user-manual_3047341057.webp)
Connecting 200-240 VAC Power to MB-40R
Adept Cobra s350 User’s Guide, Rev A
57
5.7
Connecting 200-240 VAC Power to MB-40R
Specifications for AC Power
NOTE:
The Adept robot system is intended to be installed as a piece of
equipment in a permanently-installed system.
Facility Overvoltage Protection
The user must protect the robot from excessive overvoltages and voltage spikes. If the
country of installation requires a CE-certified installation, or compliance with
IEC
1131-2,
the following information may be helpful:
IEC
1131-2 requires that the installation must
ensure that Category II overvoltages (i.e., line spikes not directly due to lightning strikes)
are not exceeded. Transient overvoltages at the point of connection to the power source
shall be controlled not to exceed overvoltage Category II, i.e., not higher than the impulse
voltage corresponding to the rated voltage for the basic insulation. The user-supplied
equipment or transient suppressor shall be capable of absorbing the energy in the
transient.
In the industrial environment, nonperiodic over-voltage peaks may appear on mains
power supply lines as a result of power interruptions to high-energy equipment (such as a
blown fuse on one branch in a 3-phase system). This will cause high-current pulses at
relatively low voltage levels. The user shall take the necessary steps to prevent damage to
the robot system (such as by interposing a transformer). See
IEC
1131-4 for additional
information.
Table 5-5. Specifications for 200/240 VAC User-Supplied Power Supply
Auto-Ranging
Nominal
Voltage
Ranges
Minimum
Operating
Voltage
a
a
Specifications are established at nominal line voltage. Low line voltage can affect robot
performance.
Maximum
Operating
Voltage
Frequency/
Phasing
Recommended
External Circuit
Breaker,
User-Supplied
200 V to 240 V
180 V
264 V
50/60 Hz
1-phase
10 Amps
DANGER:
AC power installation must be performed by a
skilled and instructed person - see
. During installation, unauthorized third parties
must be prevented from turning on power through the use
of fail-safe lockout measures.
Summary of Contents for Cobra s350
Page 1: ...Adept Cobra s350 Robot User s Guide...
Page 2: ......
Page 16: ...Chapter 1 Introduction 16 Adept Cobra s350 User s Guide Rev A...
Page 34: ...Chapter 3 Robot Installation 34 Adept Cobra s350 User s Guide Rev A...
Page 50: ...Chapter 4 MotionBlox 40R 50 Adept Cobra s350 User s Guide Rev A...
Page 62: ...Chapter 5 System Installation 62 Adept Cobra s350 User s Guide Rev A...
Page 66: ...Chapter 6 System Operation 66 Adept Cobra s350 User s Guide Rev A...
Page 84: ...Chapter 8 Maintenance 84 Adept Cobra s350 User s Guide Rev A...
Page 90: ...Chapter 9 Technical Specifications 90 Adept Cobra s350 User s Guide Rev A...
Page 98: ...Chapter 10 Cleanroom Robots 98 Adept Cobra s350 Robot User s Guide Rev A...
Page 102: ...Index 102 Adept Cobra s350 User s Guide Rev A...
Page 103: ......
Page 104: ...3011 Triad Drive Livermore CA 94551 925 245 3400 P N 05624 000 Rev A...