38
the icon
indicates that the DUT has passed the test and meets the accuracy of the task. Click any of the tasks in the
list to view and edit the task details and data.
6.1 Dial pressure gauge and digital pressure gauge calibration
1. Connect to DUT
•
Connect the internal pressure module. If using an external pressure module, connect them to LEMO port A
or B.
2. Create the task
Create the corresponding DUT tasks as described above, and fulfill the necessary information.
Table 13 Pressure gauge task setting
Subject
Valid value
Description
Pressure type
Gauge / absolute / differential
Pressure type of DUT
Input range
Numbers
Input range of DUT
Accuracy
0.06%, 0.1%, 0.16%, 0.25%, 0.4%, 0.6%,
1%, 1.6%, 2.5%, 4%, custom
Accuracy of DUT. If choose custom, the input number means the
accuracy level of the dial pressure gauge. For example: input 1.5 for
gauge level of 1.5, the range is (0.001~100)
3. Start the task
•
Select several points within the DUT’s range.
•
Use the pressure source to control the DUT’s readout reach the set points, then manually input the readout.
•
Click icon
to record the DUT’s readout and the measured value of the calibrator.
•
Click icon
to delete the last data.
Summary of Contents for 273E Series
Page 1: ...1 273Ex Handheld Pressure Calibrator...
Page 2: ......
Page 3: ......
Page 4: ...ADT273Ex Handheld Pressure Calibrator User Manual Version 2302V02 Additel Corporation...
Page 6: ......
Page 20: ...10 1 3 Basic Structure Figure 1 Basic Structure...
Page 41: ...31 Figure 16 Sensor trim Figure Figure 17 Process variable selection...
Page 56: ...46...