6247G/6247C DC Voltage Current Source/Monitor Operation Manual
1.5 Operating Check
1-10
1.5
Operating Check
This section describes the simple self-test which must be performed when operating the 6247G/6247C for
the first time. Follow the procedure below to ensure the instrument operates correctly.
1. Ensure that the
POWER
switch on the front panel is set to OFF.
2. Plug the power cable into the AC power connector on the rear panel.
CAUTION:
To prevent damage to the 6247G/6247C, do not apply a voltage or fre-
quency that exceeds the specified range.
Figure 1-4 Connecting Power Cable
3. Plug the power cable into an AC wall outlet.
AC Power Connector
6247G
AC Power Connector
6247C