
113354-23
13
CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint buildup.
IMPORTANT: The dryer must be installed in a location/environment, which the ambient
temperature remains between 40° F (4.44° C) and 130° F (54.44° C).
B. UNPACKING / SETTING UP
Remove protective shipping material (i.e. plastic wrap and/or optional shipping box) from dryer.
IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid
the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts
located in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint
door in place.
1. Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration above) or
other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear.
b. The V-belts are disconnected from the tumbler drive motor for shipping. Reconnect V-belts before
starting the dryer.
Summary of Contents for AD-190
Page 60: ...ADC Part No 113354 23 06 21 21...