Acuity Brands | One Lithonia Way Conyers, GA 30012 | Phone: 800.535.2465 | www.nlightcontrols.com | © 2020 Acuity Brands Lighting, Inc. | All rights reserved. | Rev. 09/17/2020
If a scheduled was executed on-demand and there is a power outage, when power returns, the nDTC will restore
the last scheduled event that was executed before power was lost.
Figure 15 - Running a Schedule On-Demand
Custom Holiday Events
Custom Holiday Events are user-generated holidays, that serve as additional “Runs On” periods for Holiday
Schedules. They can run for single days, based on date range, or as a relative day based on an offset (i.e. the 4th
Thursday of November).
Custom Holiday Events can be found listed in the “Runs On” screen of a Holiday Schedule and is also visible
through the Holidays tab of the Schedule Configuration Dashboard.
Figure 16 - Custom Holiday Events in the "Runs On"
screen of a Holiday Schedule
Figure 17 - Custom Holiday Events list from the Holiday tab in the Schedule
Configuration Dashboard
1.
Run Start Trigger – When tapped it triggers the Start Trigger to run. The event will
disregard the start time and will run over all existing scheduled events.
2.
Run End Trigger – When tapped it triggers the End Trigger to run. The event will
disregard the end time and will run over all existing scheduled events.
3.
Previous Schedule Button – When tapped, this triggers the events from the last
normally activated schedule run. It deactivates the triggering of the first two buttons.