ACT ACT-VCC-1000 DC User Manual Download Page 1

 

 

 

ACT-VCC-1000 DC Cabinet Air Conditioner   

User Manual 

 

 

 

 

 

Read this manual carefully before installation and use. 

 

 

Summary of Contents for ACT-VCC-1000 DC

Page 1: ...ACT VCC 1000 DC Cabinet Air Conditioner User Manual Read this manual carefully before installation and use...

Page 2: ...s 4 2 3 Working Principles 4 2 4 Product features 4 2 5 Technical Specifications 5 2 6 Air Circulation and Remote Mounting 5 2 7 Operation of the Unit 6 2 8 Condensate Handling 6 2 9 LED Display Param...

Page 3: ...e cooling device intended for applications where the internal air of a sealed electrical enclosure must be cooled or maintained at a particular temperature This manual will provide an overview of the...

Page 4: ...the environment The high pressure condensate then flows through an expansion valve which reduces the fluid s pressure and partially vaporizes the fluid The expansion and partial vaporization cool the...

Page 5: ...plications If the unit is to be mounted remotely to cool an enclosure ductwork and a separting plate must be used as shown in Figure 2 3 Ductwork should be made as short as possible to minimize the im...

Page 6: ...will remain in a standby mode where only the internal fan runs at its lowest speed o Active Cooling mode If the air temperature is greater than the setpoint temperature the unit will run on normal co...

Page 7: ...12 hours 0 72 hours P97 Return to factory setting Pressing the S key will return the product to default factory settings Heating functions are optional and not included on all units The above paramete...

Page 8: ...rom damage E08 Low temperature warning E09 DC Power overvoltage warning E10 DC Power undervoltage warning E11 Refrigerant circuit pressure is too high warning E12 Refrigerant circuit pressure is too l...

Page 9: ...ing straps are unbroken and that the wooden box is undamaged not deformed or wet Use scissors or a knife to dismantle the packing belt then open the wooden box After opening the package please check t...

Page 10: ...abinet is well sealed using the supplied gasket Do not turn the unit on immediately after finishing the installation the unit must remain standing vertically for more than 30 minutes before being turn...

Page 11: ...fer to the above table for size All wires must be properly torqued to the relevant terminals All national wiring regulations and local electrical codes should be followed based upon instalation locati...

Page 12: ...operational checks After Air Conditioner is installed and the electrical connection is completed please complete the following checklist Table 6 1 Pre operational checks Steps Checking items 1 Ensure...

Page 13: ...ludes standby operation and active cooling mode 6 3 LED display manual The interface of the LED display is shown in Figure 6 2 Figure 6 1 LED Display Figure 6 2 LED Display faceplate Table 6 2 Definit...

Page 14: ...S key to confirm each digit Once the correct password is entered the system will save the new parameter value and display code End then return to normal display status automatically Note While in the...

Page 15: ...on Check for dust build up around the fan blades on both the internal and external fans If significant dust has accumnulated use compressed air to blow dust off of fan blades until clean 7 1 4 Alarm c...

Page 16: ...work under this Order unless Buyer consents otherwise in writing Seller shall have the obligation to maintain any and all property furnished by Buyer to Seller and shall be responsible for all loss or...

Page 17: ...ceptance payment use or resale of Goods by Buyer shall not release Seller of any of Seller s obligations representations or warranties hereunder Payment for any Goods shall not be deemed an acceptance...