
51
Commissioning and operation
7.2 Initial
commissiong
This chapter describes prerequisites for initial commissioning of the automatic antiflood
protection system and handover to the user.
7.2.1 Prerequisites, presence and realisation
Prerequisites for the initial commissioning:
Q
All sanitary and electrical works are finished,
chapter 6
.
Q
Shaft and automatic antiflood protection system were cleaned thoroughly (from
possible building waste)
Q
Before the Euro plug is inserted in power socket, make sure that the operating seal
is 90 % open (
chapter 6.4.2).
Q
Water connection with hose or watering can
Q
Filled water bottle or similar, water level min. 0.5 l
Q
Measuring cup
Q
Stop watch
Persons required during initial commissioning:
Q
Plumber
Q
Owner or user
Summary of Contents for Quatrix-K 620368
Page 57: ...57 Commissioning and operation I...
Page 71: ...71 Operator manual Period from to Inspection and maintenance works Works Date Signature...
Page 72: ...72 Operator manual Period from to Repair and servicing works Works Date Signature...
Page 73: ...73 Operator manual Period from to Checks Works Date Signature...
Page 74: ...74...
Page 75: ...75...