
ACO L i g h t l i n e
QuARTz by ACO
ShowerDrain Lightline
Installation & Operation
Product Description
ACO Lightline contains two low-voltage battery-operated LED units which fit directly into the
QuARTz by ACO ShowerDrain channel grating. These units will come on automatically as
soon as they come in contact with water and will come off approximately two minutes after
the shower is turned off.
Charging the LED Unit
The LED unit must be fully charged before installing for the first time. Make sure the LED
unit is clean and dry, then insert it into the charger as shown in the picture below. Note the
LED unit profile orientation before fitting it into the charger.
Connect the main adaptor to the charger and turn the power on. Control indicators will begin
to blink. The charging process can take up to 18 hours to complete.
Note
The Indicators will blink quickly if the energy
level in the LED unit is low. If the indicators
continue to blink quickly for more than one
hour, then the LED unit is defective and
should be replaced.
Under normal conditions of use, a fully char-
ged module should last approximately three
months before needing a replacement.
For optimum performance, always keep
the LED unit fully charged to preserve their
lifespan.
Control indicators
Installing the LED Unit
1. Remove the grating form the shower
channel.
2. Remove the grating plastic locks from
the sides of the grating and insert the LED
unit making sure that the LEDs are facing
toward the center of the grating while the
angled top faces upward allowing water to
drain freely.