Operation
80/ 100
Oleolift-C
Starting automatic mode:
Î
Start pump 1 and 2 automatic mode,
Chapter 4.3.2 "Page
view _ Detailed view".
Pump 1
P1
Manual
OFF
Automatic
Close
Pump 2
P2
Manual
OFF
Automatic
Close
Acknowledging a malfunction:
Î
Acknowledge fault,
Chapter 4.3.4 "Page view _ Fault
memory".
New entry
X
Name
Type
Description
Close
The trial run is finished.
Final work:
■
Position the cover again
■
Document settings,
Chapter 4.4.1 "Touch panel"
■
Document the commissioning,
Appendix: “Commissioning report”
4.7 Requirements for operation
For the operation, self-monitoring, maintenance, emptying and general inspection of the
separator system, DIN EN 858-2, DIN 1999-101, DIN EN 12056-5, DIN 1986-100, and any
necessary local authority rulings and the operating and maintenance instructions must be
utilised.
In addition, existing statutory provisions and water-law provisions regarding self-monitoring,
maintenance and general inspection must be observed.
IMPORTANT
The plant must only be operated according to its intended use,
Chapter 1.1 “Intended Use”.
The work necessary for the operator during operation is restricted to:
■
Perform monthly self-monitoring of the light liquid separator,
Chapter 4.7 "Self-monitoring of the light liquid separator"
■
Perform at least 2 test runs of the pump station every month,
Chapter 4.5 "Performing a test run of the pump station".
■
Initiate the emptying and cleaning of the light liquid separator as required or after the
control unit has signalled 80 % or 100 % of the maximum light liquid storage quantity,
Chapter 4.8.1 "Emptying and cleaning".
■
Check the plant after signalling the raised water level message H-AL and, if necessary,
carry out a cleaning of the coalescence insert,
Chapter 4.8.2 "Cleaning the
coalescence insert"