Operation
76/ 100
Oleolift-C
4.5 Starting up the submerged pumps
IMPORTANT
To ensure dry-running protection, the pump chamber of the submerged pump
must be vented during the initial start-up.
It can be filled with drinking water, rainwater or process water (if it meets the local
discharge conditions for effluent).
The pump station chamber can be filled via the inlet pipe of the plant or via the inspection opening.
Requirement: Separator chamber is filled with water.
The description applies to both submerged pumps:
Î
Lift the cover out of the cover frame above
the pump station chamber and store to
the side.
Î
Remove the submerged pumps from the
pump station chamber and store to the side.
Î
Fill the pump station chamber up to approx.
half-full (relative to the inlet level).