
Installation
50/ 100
Oleolift-C
3.5 Electrical installation
WARNING
Electric shock risk in case of improper electrical installation
■
The control unit must not be connected to the power supply until after all
installation work has been completed.
■
The voltage supply must be implemented in compliance with the directives of
the local power supplier.
■
Electrical connections may only be executed by qualified electricians.
■
Electrical connections are to be made according to the circuit diagram of the
control unit or the idOil-30 instructions,
chapter 7.5 "Control units" or the
documents accompanying the product "Assembly and operating instructions
idOil-30".
IMPORTANT
Voltage failures caused by longer cable routes must be considered on site.
Heating and working socket for the outdoor cabinets and Ex-safety barrier can be
obtained from ACO as optional extras.
3.5.1 Overview of the electrical installation work
9
8
7
1
2 - 5
6
Item Work
Description
Chapter
1
Supply power to the heater (optional) and the power socket
(optional)
3.5.2
2
Connect the connection cable of the submerged pumps
3.5.5
3
Check the rotational direction of the submerged pumps
3.5.6
4
Connect the connection cable for the level probe
3.5.7
5
Connect the cable extension (idOil sensors)
3.5.9
6
Connect cable connector LCJ1-3
3.5.8