
Installation
49/ 100
Oleolift-C
Plant/NS
H
OIL / 1
H
OIL / 2
6-10 / 2500 _ DL 100
1,490
1,440
6-10 / 3000 _ DL 50
1,490
1,440
6-10 / 3000 _ DL 100
1,490
1,440
15-30 / 4500 _ DL 100
1,540
1,480
Installation of the idOil-LIQ high liquid level sensor
Bracket with screw connection for attaching the high liquid level sensor is mounted on the
coalescence insert on delivery.
Î
Loosen the union nut of the screw
connection.
Î
Push the high liquid level sensor into the
screw connection.
Î
Attach the high liquid level sensor with a
union nut at a distance of 50 mm.
50
Î
Lift the cover out of the cover frame and
store to the side (1).
Î
Place dowels in the maintenance opening
of the cover plate and screw in the screw
hooks (2).
Î
Put the coalescence insert over the
guide of the drain dip tube, position it in
the centre and press down until it rests
on the surrounding plate (3).
Î
Place the sensor connection cable in a
loop around the screw hook and fix it
with cable ties (4).
Î
After mounting all sensors, put the cover
back in place.
3.
3.
3.
2.