
Installation
42/ 100
Oleolift-C
Î
Protect the end of the submerged pump
connecting cable against penetrating
moisture.
Î
Pull the connecting cable upwards (not
while energised) until it reaches the
chain holder.
Î
Place the loop around the cable eye (
●
)
and fasten with cable tie.
Î
Hang the cable lug on the chain holder.
Î
Pull the connecting cable (together
with the connecting cables of the level
probe and the sensors) with the pull
wire through the cable conduit to the
installation site of the control unit.
Î
Keep sufficient excess cable length
(approx. 1 m), to enable the wiring in the
terminal compartment of the control unit.
Î
Replace the cover.
●
This is the only way that enables the submerged pumps to be removed and to be stored to the
side next to the inspection opening.
3.4.3 Mounting the level probe with protective pipe
The level sensor has a 20 m, 50 m and/or 80 m long connecting cable (connected and sealed
on the level sensor).
IMPORTANT
Protect the end of the connecting cable against the penetration of moisture.
The probe bracket is already assembled in the tank in the as-delivered condition.
A protective pipe (optional, total length 1,220 mm), a tensioning clamp and a cable eyelet are
delivered as loose in the as-delivered condition.
The protective pipe must be adjusted to the
length measurement
L
according to the
following table.
Longitudinal measurement L:
Plant/NS
Longitudinal measurement L [cm]
3-6 / 600 _ DL 50
700
3-6 / 900 _ DL 50
700
3-6 / 1200 _ DL 50
700
3-6 / 1800 _ DL 50
700
3-6 / 2500 _ DL 50
700