
Installation
25/ 100
Oleolift-C
3 Installation
IMPORTANT
Always ensure the required qualifications of personnel,
Chapter 1.5 "Personnel qualifications".
3.1 Installation example (schematic diagram)
Example shows the installation of the system when draining a car park. The components used
can differ, depending on the installation situation.
RS
RS
R
E
1
2
3
4
5
6
7
8
9
17
16
15
14
13
12
11
10
1 = Channel (optional)
2 = Manhole cover (optional)
3 = On-site ventilation pipe for Lipulift-C
4 = Outdoor cabinet (optional)
5 = Control unit
6 = On-site backflow loop
7 = Outdoor cabinet (optional)
8 = PBBL / Pipe bottom backflow loop (the backflow
loop must be established above the backflow level)
9 = BFL / Backflow level (if not otherwise known =
upper edge of street)
10 = Road gully (optional)
11 = Sewage channel
12 = On-site connecting pipe to sewer
13 = On-site pressure pipe
14 = On-site cable duct
15 = Oleolift-C
16 = Direct extraction (in flow direction right or left) for
separator chamber (optional)
17 = On-site inlet pipe