ACME KOOL-CEL PDR 4 Owners Manual Instructions Download Page 1

ACME ENGINEERING & MANUFACTURING CORP.

P.O. Box 978

Muskogee, Oklahoma 74402

918/682-7791 FAX: 918/682-0134

www.acmeag.com • www.acmehort.com

[email protected] • [email protected]

Form 610260

Model PDR 4” and 6”

Cooling Systems

Owners Manual &
Instructions for
Acme PDR 4” and 6”
Kool-Cel
Evaporative Cooling
System

Summary of Contents for KOOL-CEL PDR 4

Page 1: ...ogee Oklahoma 74402 918 682 7791 FAX 918 682 0134 www acmeag com www acmehort com acmeag acmefan com acmehort acmefan com Form 610260 Model PDR 4 and 6 Cooling Systems Owners Manual Instructions for A...

Page 2: ...er Pump 3 Distribution and return system a combination of the following packages for the length of the system See exploded view and parts list on page 9 for parts identification a 5 Basic Package e 10...

Page 3: ...t instructions for proper framing dimensions Note The side wall structural members should be left intact as shown in figure 1 Stringers The framing and support stringers could be any type of material...

Page 4: ...ckets Hole spacing is shown in figure 2 and figure 3 Hints Framing Verify framing installation using instructions in framed opening B and in figure 1 on page 3 If framing is not properly installed as...

Page 5: ...ch side of the bolt holes as in figure 4 Place the next gutter section inside the gutter end section overlapping the first section with the notched end located under flange toward the drain end Line u...

Page 6: ...s with 1 4 x 1 hex head screws as shown in figure 6 and figure 7 4 systems or figure 8 6 systems 2 Caulk the top cover support sections at the seams then center the top cover connectors over each seam...

Page 7: ...ad screws and whiz lock nuts Locate the proper top cover end cap and slip it over the pipe Attach it to the top stringer with two 1 4 x 1 1 4 screws 2 Next attach the end closure panel to the top cove...

Page 8: ...stall between every other pad centered between the top and bottom and the front and back of the pads Holding the tall pad support in position press the pads together until the support sticks into both...

Page 9: ...closure panel 9 Top cover end cap 10 Pipe hanger 11 Distribution pipe 12 Slip coupling 13 Pipe cover end section 4 14 Pipe cover section 4 15 Pipe cover end section 6 16 Pipe cover section 6 17 End c...

Page 10: ...e not purchased this kit refer to figures 20 21 for items required Assemble the plumbing as shown in figures 20 21 after the system has been installed Notes A 2 PVC leader pipe by others B Screen over...

Page 11: ...r or the male threads of the plugs Allow at least one hour drying time for the cement Parts Listing Ref No Description Qty 1 1 1 2 Tee 1 2 2 4 Piece of 1 1 2 Pipe 1 3 1 1 2 Female Adapter 2 4 1 1 2 Pl...

Page 12: ...6 X 30 NEOPRENE 5 2 PVC PIPE 6 2 THREADED TANK FITTING W 2 RINGS 7 PUMP 8 TRANSITION PUMP TANK 9 TRANSITION PUMP TANK LEFT HALF 10 TRANSITION PUMP TANK RIGHT HALF 11 PUMP POWER CORD SUPPLIED W PUMP 1...

Page 13: ...schedule should be set up to keep your Kool Cel system operating at peak efficiency and to maximize the life of the system I A visual check should be made whenever you re in the area of the pad 1 Chec...

Page 14: ...irculating water and below 40 000 ppm in make up water IV Algae will grow on any surface that is wet and exposed to sunlight To help prevent algae build up follow these tips 1 Do not draw make up wate...

Page 15: ...Page 15...

Page 16: ...rranties on behalf of the Company or to assume for the Company any other liability in connection with any of its products except in writing and signed by an offi cer of the Company REPLACEMENT PARTS I...

Reviews: