- 38 -
5.2 Software / Firmware Upgrade Process
5.2.1 Hardware prepared:
Hardware Requirement:
1. ISP board x 1
2. DSUB VGA cables x 2
3. Printer cable (with one male connector and another female connector) x 1.
4. PC or Notebook with parallel (printer) port x1.
Connect to target monitor
VGA signal input from 15pin D-sub
cable of PC or NB.
Connect ISP board and PC
with printer port cable
Check the Jumpers on the
ISP Circuit Board (make sure
J5, J6, J7, J8 are set at ping
1,2 )
Summary of Contents for G225HQ
Page 22: ... 22 3 9 Packing ...
Page 23: ... 23 4 Disassembly Assembly 4 1 Exploded View ...
Page 24: ... 24 ...
Page 46: ... 46 5 4 OSD Operation Guide ...
Page 47: ... 47 ...
Page 48: ... 48 ...
Page 49: ... 49 ...
Page 62: ... 62 Appendix 1 Screw List Torque A STANDARD SCREW TORQUE QCS ...
Page 63: ... 63 ...
Page 64: ... 64 B STANDARD SCREW TORQUE QZB QMX ...
Page 66: ... 66 ...
Page 67: ... 67 Appendix 3 I F Board Please see the next page ...