- 1 1 -
Basic Operating P ractices
DANGER
1)
Some control panels, transformers, motors junction boxes and other parts have
high-voltage terminals, these should not be touched or a severe electric shock
will be sustained.
2) Do not touch a switch with wet hands. This, too, can cause an electric shock.
WARNING
1)
The emergency stop push -button should be well known so that it can be operated
at any time without having to look for it.
2)
Before replacing a fuse, please power off the ma chine.
3)
Provide sufficient working space to avoid hazard. To prevent accidents all floors
should be dry and clean.
4)
Water or oil can make floors slippery and hazardous. To prevent accidents all
floors should be dry and clean.
5)
Before operating switches, pleas e always check that they are the right ones.
6)
Never touch a switch accidentally.
7)
Work benches near the machine must be strong enough to prevent accidents.
Articles should be prevented from slipping off the bench surface.
8)
If a job is to be done by two or mor e persons, coordinating signals should be
given at each step of the operation. Unless a signal is given and acknowledged,
the next step should not be taken.
CAUTION
1)
In the event of power failure, turn off the main circuit breaker immediately.
2)
Use the recommended lubricants and grease or acceptable equivalents.
3)
Replacement fuses should have the proper current ratings.
4)
Protect the inverter unit, operation panel (6VK) , control panel, etc. from shocks,
since this could cause a failure or malfunction.
5)
Do not change parameters, values and other electrical settings unnecessarily. If
such changes are unavoidable, record the values prior to the change so that they
can be returned to their original settings if necessary.
6)
Do not soil, scratch or remove the c aution plate. Should it become illegible or
missing, please order another caution plate from the supplier. (Please specify
the part number shown at the lower right of the plate.)
Summary of Contents for e-mill 3VK
Page 37: ... 36 e mill 3VK Figure 7 Lifting method of e mill 3VK ...
Page 38: ... 37 e mill 3VKH e mill 5VK Figure 8 Lifting method of e mill 3VKH e mill 5VK ...
Page 41: ... 40 e mill 3VKH e mill 5VK Figure 11 Installation layout ...
Page 42: ... 41 e mill 6VK Figure 12 Installation layout ...
Page 45: ... 44 4 6 Wiring Diagram A Regular Circuit Diagram for 3VS 3VSII 3VK 3VKH 5VK ...
Page 46: ... 45 ...
Page 47: ... 46 ...
Page 48: ... 47 ...
Page 49: ... 48 The Control Panel ...
Page 51: ... 50 Electric Cabinet Layout ...
Page 52: ... 51 Electric Component List ...
Page 53: ... 52 B Regular Circuit Diagram for 6VK ...
Page 54: ... 53 ...
Page 55: ... 54 ...
Page 58: ... 57 Electric Cabinet Layout ...
Page 59: ... 58 ...
Page 61: ... 60 C UL Electric Diagram for 3VS 3VSII 3VK 3VKH 5VK ...
Page 62: ... 61 ...
Page 64: ... 63 Electric Cabinet Layout ...
Page 65: ... 64 Electric Component List ...
Page 66: ... 65 D UL Electric Diagram for 6VK ...
Page 67: ... 66 ...
Page 70: ... 69 Electric Cabinet Layout ...
Page 71: ... 70 ...
Page 72: ... 71 Electric Component List ...
Page 73: ... 72 ...
Page 75: ... 74 ...
Page 76: ... 75 UL listing electrical part list for e mill 3VS 3VSII 3VK 3VKH 5VK 6VK ...
Page 77: ... 76 ...
Page 78: ... 77 F Amendment of UL Parts List File No TR14101501 Date 4 11 19 ...
Page 85: ... 84 5 6 MSDS for Lubricant in Lubrication Pump ...
Page 86: ... 85 ...
Page 87: ... 86 ...
Page 88: ... 87 ...
Page 89: ... 88 ...
Page 90: ... 89 ...
Page 91: ... 90 ...
Page 110: ... 109 B For regular e mill 6VK ...
Page 111: ... 110 C For UL listing e mill 3VS 3VSII 3VK 3VKH 5VK ...
Page 112: ... 111 D For UL listing e mill 6VK ...
Page 118: ... 117 8 1 3HP MILLING HEAD ...
Page 120: ... 119 3HP MILLING HEAD ...
Page 122: ... 121 3HP MILLING HEAD ...
Page 124: ... 123 3HP MILLING HEAD ...
Page 126: ... 125 3HP MILLING HEAD ...
Page 128: ... 127 8 2 3HP Head Top Housing ...
Page 130: ... 129 3HP Head Top Housing ...
Page 132: ... 131 8 3 3HP Head Back Gear ...
Page 134: ... 133 3HP Head Back Gear ...
Page 136: ... 135 3HP Head Back Gear ...
Page 138: ... 137 8 4 5HP MILLING HEAD HAND FEED ASS Y ...
Page 140: ... 139 5HP MILLING HEAD HAND FEED ASS Y ...
Page 142: ... 141 8 5 5HP MILLING HEAD SPINDLE ASS Y ...
Page 144: ... 143 8 6 5HP MILLING HEAD AUTO FEED ASS Y ...
Page 146: ... 145 5HP MILLING HEAD AUTO FEED ASS Y ...
Page 148: ... 147 5HP MILLING HEAD AUTO FEED ASS Y ...
Page 150: ... 149 8 7 5HP E mill HEAD TOP HOUSING ...
Page 152: ... 151 5HP E mill HEAD TOP HOUSING ...
Page 154: ... 153 8 8 5HP E mill HEAD BACK GEAR ...
Page 156: ... 155 5HP E mill HEAD BACK GEAR ...
Page 158: ... 157 8 9 3VS 3VSII Basic Machine ...
Page 160: ... 159 3VS 3VSII Basic Machine ...
Page 162: ... 161 3VS 3VSII Basic Machine ...
Page 164: ... 163 3VS 3VSII Basic Machine ...
Page 166: ... 165 8 10 3VK Basic Machine ...
Page 168: ... 167 3VK Basic Machine ...
Page 170: ... 169 3VK Basic Machine ...
Page 172: ... 171 3VK Basic Machine ...
Page 174: ... 173 8 11 3VKH Basic Machine ...
Page 176: ... 175 3VKH Basic Machine ...
Page 178: ... 177 3VKH Basic Machine ...
Page 180: ... 179 3VKH Basic Machine ...
Page 182: ... 181 8 12 5VK Basic Machine ...
Page 184: ... 183 5VK Basic Machine ...
Page 186: ... 185 5VK Basic Machine ...
Page 188: ... 187 5VK Basic Machine ...
Page 190: ... 189 8 13 6VK Basic Machine ...
Page 192: ... 191 6VK Basic Machine ...
Page 194: ... 193 6VK Basic Machine ...
Page 196: ... 195 8 14 3VS 3VSII 3VK 3VKH 5VK Leadscrew Assembly ...
Page 198: ... 197 8 15 6VK Leadscrew Assembly ...
Page 200: ... 199 6VK Leadscrew Assembly ...