Initial troubleshooting checklist
Use the checklist below to eliminate the possible cause for the problem
you are encountering.
•
AC power available at the wall outlet?
•
Is the power supply module properly installed?
•
Is the system power cord properly plugged into the power supply
module socket? and connected to a NEMA 5-15R outlet for 100-
120 V or a NEMA 6-15R outlet for 200-240 V?
•
Are all peripheral cables correctly connected and secured?
•
Did you press the system power button to turn the server on
(power on indicator should be lit green)?
•
Are all device drivers properly installed?
•
Is hard disk drive(s) properly formatted and configured?
•
Are the BIOS configuration settings in the BIOS setup utility
correct?
•
Is the operating system properly loaded?
Refer to the operating system documentation.
•
Are all hardware components compliant with the tested
components lists?
•
Are all internal cables correctly connected and secured?
•
Are the processors fully seated in their mainboard sockets?
•
Are all standoffs in the proper location and not touching any
components, causing a potential short?
•
Are all add-in expansion cards fully seated in their mainboard
slots?
•
Are all system jumpers correctly set?
•
Are all switch settings on add-in boards and peripheral devices
correct?
To check these settings, refer to the manufacturer’s
documentation that comes with them. If applicable, ensure that
there are no conflicts (e.g., two add-in boards sharing the same
interrupt.
Summary of Contents for Altos R520 M2
Page 1: ...Acer Altos R520 M2 Series User s Guide ...
Page 14: ...xiv ...
Page 19: ...1 System tour ...
Page 35: ...17 54 U23 Broadcom BCM5221PHY chipset 55 U6 Intel 82576EB GbE chipset No Code Description ...
Page 43: ...2 System setup ...
Page 51: ...3 System upgrade ...
Page 95: ...4 System BIOS ...
Page 102: ...4 System BIOS 84 Processor Configuration ...
Page 108: ...4 System BIOS 90 Memory Configuration ...
Page 110: ...4 System BIOS 92 Advanced Chipset Configuration ...
Page 136: ...4 System BIOS 118 ...
Page 137: ...5 System troubleshooting ...
Page 149: ...Appendix A Server management tools ...
Page 158: ...Appendix A Server management tools 140 ...
Page 159: ...Appendix B Rack mount configuration ...
Page 160: ...This appendix shows you how to set up the Altos R520 M2 server in a rack mount configuration ...
Page 168: ...Appendix B Rack mount configuration 150 6 Fully extend the mounting rails on the rack ...
Page 172: ...Appendix B Rack mount configuration 154 ...
Page 173: ...Appendix C Altos eXpress Console ...
Page 174: ...This appendix provides information about the Altos eXpress Console utility ...
Page 214: ...Appendix C Altos eXpress Console 196 ...
Page 218: ...200 ...