Linearity Testing •
7
109
08424705001 (01) 2017-04 USA • Accu-Chek Inform II Operator’s Manual Version 6
Applying a linearity test sample
Once the meter has checked the test strip, the hourglass
icon disappears and you are prompted to apply linearity
solution.
1
Wait until the flashing drop appears in the display
before applying the solution. The meter beeps.
2
Apply a drop of the linearity solution to the
front
edge
of the test strip. Do
not
apply the solution to
the top of the strip.
The linearity solution is pulled into the test strip
area by capillary action.
Once sufficient linearity solution has been detected, the
meter beeps and the measurement begins.
Linearity Test
Linearity 12345678 L1
Strip Lot 545794
12:48 pm
03/17/17
When applying the linearity solution, position the meter
so that the test strip port is always higher or on the
same level as the linearity solution. This prevents any
excess solution from flowing down the strip and enter-
ing the meter.
Summary of Contents for Inform II
Page 3: ...08424705001 01 2017 04 USA Operator s Manual Version 6 0 A ACCU CCU CHEK HEK Inform II System ...
Page 245: ...245 Notes ...
Page 246: ...246 Notes ...
Page 247: ...247 ...