104
08424705001 (01) 2017-04 USA • Accu-Chek Inform II Operator’s Manual Version 6
Linearity testing intervals
The linearity of the system should be checked before it is
used the first time for patient testing. The intervals for
subsequent linearity tests are determined by the facility
that operates the system. Linearity testing can also be run
when you want to check the overall performance of the
system.
Information stored during
linearity testing
The following information is stored for every linearity test:
■
Test result
■
Lot number of the linearity solution
■
Level of linearity solution (L1 to L6)
■
Operator ID (if configured)
■
Lot number of the test strips
■
Time and date of test
■
Comments (if applicable)
Summary of Contents for Inform II
Page 3: ...08424705001 01 2017 04 USA Operator s Manual Version 6 0 A ACCU CCU CHEK HEK Inform II System ...
Page 245: ...245 Notes ...
Page 246: ...246 Notes ...
Page 247: ...247 ...