5.12 SAFETY CHECK
When the installation is completed, it must be checked according to the safety checklist. See separate
document
Safety Check List (document number: 7000500 en XX).
• Carry out the safety check list and fill in the checked items.
• Carry out the testing of electrical installation and fill in the checked items.
• Confirm by a signature that above tests are done without deviations on the last page in the safety
check list document.
• Send the safety check list to Aritco Lift AB.
• When you have received the declaration of conformity signed by Aritco Lift AB place the CE marking
label on the platform.
Fig. 98 Placing the CE label on the platform
7000 100 en-GB AD
95
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...