Maintenance
& Troubleshooting
.Replacement procedures
Pentra
80 - User Manual - RAB108EA
7–11
Fig. 7–8
Reagent priming
2.1.3. Waste container replacement
Unscrew the waste container cap.
Replace waste container according to your laboratory’s protocol.
Close the empty container with the cap and dispose of waste liquids according to your lo-
cal\national organizations.
2.2. Optical bench lamp replacement
2.2.1. Lamp replacement
Wait for the lamp to cool down before handling it.
Power off the instrument.
Open the instrument left-hand and right-hand side panels, lift the top cover of the instrument
as well (see
3. Instrument panels & cover Removals,
Locate the Optical bench at the top left of the instrument
(
Summary of Contents for Pentra 80 RAB108EA
Page 1: ...User Manual P n RAB108EA ABX Diagnostics B P 7290 34184 MONTPELLIER Cedex 4 FRANCE...
Page 12: ...10 Section9 Glossary 1 Glossary 9 2 2 Index 9 4 3 9 11...
Page 87: ...Quality Assurance Calibration Pentra 80 User Manual RAB108EA 3 31 Fig 3 29 Delete options...
Page 162: ...Pentra 80 5 10 Pentra 80 User Manual RAB108EA Fig 5 6 Units tab...
Page 194: ...Pentra 80 5 42 Pentra 80 User Manual RAB108EA...
Page 214: ...Pentra 80 6 20 Pentra 80 User Manual RAB108EA...
Page 264: ...Pentra 80 7 50 Pentra 80 User Manual RAB108EA...
Page 284: ......
Page 286: ......
Page 288: ......
Page 290: ......
Page 292: ......
Page 294: ......
Page 296: ......
Page 306: ...Pentra 80 9 10 Pentra 80 User Manual RAB108EA Z Zoom Chap 4 28...