background image

Absco Industries

Assembly Instruction Manual

ABSCO SPACE SAVER SHED

MODEL: 23081SK

2.26mW x 0.78mD x 1.80mH, 1.95mH

Model: 23081SK

11/11/19

1.1

1  

 

 

Download the Absco 
Sheds Assembly App 
for instructional videos 

MANUFACTURED

IN AUSTRALIA

SNAPTiTE

Assembly

ABSCO INDUSTRIES

ASSEMBLY INSTRUCTION MANUAL

SHED MODEL: 23151GK 

21-11-2017  

      

CONCRETE SLAB

2360mm

1620mm

FRONT:   2.26m

SIDE:       1.52m

HEIGHT:  1.95m

We thank you for choosing an Australian made

shed. For further assistance please visit our detailed

instructional video library at

Http://www.abscosheds.com.au/watch-videos

At ABSCO Industries we are always looking to be

number ONE, so please let us know what you think

of our instructions. Feedback makes us better.

[email protected]

CONCRETE 

REBATED EDGE

BOTTOM CHANNEL

CONCRETE SLAB

75mm WIDE REBATE

100mm

WHEN LAYING YOUR CONCRETE

SLAB, ENSURE THERE IS A

REBATED EDGE 25mm DEEP

AROUND THE PERIMETER

THIS WILL HELP WATER EGRESS

FROM THE BASE OF THE SHED

Absco Industries

Premier Shed Model: 23151GK

PAGE 01

When laying concrete slab, ensure there 
is a rebated edge 25mm deep around the 
perimeter. This will help water egress from 
the base of the shed.

AU: 1800 029 70

1

NZ: 0800 466 444

[email protected]

www.abscosheds.com.au

CONCRE

TE SLAB

2360mm

880m

m

Summary of Contents for Space Saver 23081SK

Page 1: ... Http www abscosheds com au watch videos At ABSCO Industries we are always looking to be number ONE so please let us know what you think of our instructions Feedback makes us better feedback absco com au CONCRETE REBATED EDGE BOTTOM CHANNEL CONCRETE SLAB 75mm WIDE REBATE 100mm WHEN LAYING YOUR CONCRETE SLAB ENSURE THERE IS A REBATED EDGE 25mm DEEP AROUND THE PERIMETER THIS WILL HELP WATER EGRESS F...

Page 2: ...te for the shed must be level An uneven surface may result in misalignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on FINAL CONSTRUCTION page TOOLS REQUIRED SAFETY NOTES Some parts may have sharp edges It is advisable to wear gloves when handling these items and safety glasses if drilling holes Sensible shoes are highly re...

Page 3: ...N PART No CHECK QTY QTY 1 1915 X 773mm 43B STEEL SHEET 1 1 1 3 2 1 1915 X 773mm 43C STEEL SHEET STEEL SHEET 1915mm X 773mm X4L STEEL SHEET 1915mm X 773mm X4R STEEL SHEET 865mm X 773mm 43D STEEL SHEET 1725mm X 773mm B 2 2 1 61B CHANNEL L 786mm CHANNEL L 773mm 81J 1 2 89A JAMB L 1785mm 1 1 58A CHANNEL WITH HINGES L 1725mm 58B CHANNEL L 1725mm 58C CHANNEL L 773mm STEEL SHEET 1785mm X 731mm 32A 79B CH...

Page 4: ...T Check off all components COMPONENT DESCRIPTION PART No CHECK COMPONENT DESCRIPTION PART No CHECK QTY 54AL 54CL 54BL 81DL 81CL QTY 54CR 1 1 1 1 2 1 1 1 1 2 CHANNEL L 1126 5mm CHANNEL L 1126 5mm CHANNEL L 1126 5mm CHANNEL L 1126 5mm CHANNEL L 1126 5mm 54BR 81DR 81CR 54AR CHANNEL L 1126 5mm CHANNEL L 1126 5mm CHANNEL L 1126 5mm CHANNEL L 1126 5mm CHANNEL L 1126 5mm ...

Page 5: ...20mm 88B LIP TRIM L 865mm 1 ASSEMBLY INSTRUCTIONS 12A 1 DOOR STRAP L 165mm CSJ 6 CHANNEL JOINER L 200mm 1 PSTKSGL SINGLE DOOR FITTINGS PACK DOOR PADBOLT HASP 1 1 SELF TAPPING SCREWS PACKET CONTAINING 220 1 DOOR PADBOLT FAST006 3 16 COUNTERSUNK SCREWS NUTS 6 3 2 x 8mm BLIND POP RIVETS 6 PSTKSGL SINGLE DOOR FITTINGS PACK PACK 6P SCREW PACK 6 PACK 6P SCREW PACK 6 1 PHILLIPS DRIVER BIT 3mm DRILL BIT 1...

Page 6: ...tap the channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need for screws FASTENING SYMBOLS Secure channel to sheeting by SNAPTiTE fastening method Join components together with one screw at this location only as some channels have extra holes that are not required...

Page 7: ...the JOIN text is marked Push down one side of the CSJ until you hear a click Step 3 Join the second channel to the CSJ by positioning the JOIN of the channel at the centre of the CSJ on an angle Push the CSJ into the channel until you hear a click Finished Channel The joined channels should now look like the picture with the CSJ positioned equally inside of the joined channels Drill out holes with...

Page 8: ...BR 54BL 54CL 54CR 54AR 54AL 81CR 81CL 2 X 81CR 2 X 81CL 1 X 54AR 1 X 54AL 1 X 54CR 1 X 54CL 1 X 54BR 1 X 54BL 1 X 81DR 1 X 81DL NOTE SOME CHANNELS HAVE HOLES IN THEM YOU WILL NEED TO RE DRILL HOLES ON ANY CHANNEL WHERE THE CSJ JOINING CHANNEL COVERS HOLES ON THE CHANNELS YOU ARE CONNECTING SIDE PANEL ASSEMBLY Check off all components Note Join together 12x Channel sections using 6x channel joiners...

Page 9: ...dustries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 23081SK 2 26mW x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 9 ROOF COMPONENT OVERVIEW ROOF COMPONENT OVERVIEW 43D 43D 43D 81C 88B 81C 88B ...

Page 10: ...Manual ABSCO SPACE SAVER SHED MODEL 23081SK 2 26mW x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 10 WALL COMPONENT OVERVIEW X4R 32A 32A 43B 43C 43B X4L B 81J 61B 54B 61B 81J 54C 79B 22A 54A 90B 91A 89B 89A 81D WALL COMPONENT OVERVIEW ...

Page 11: ...dustries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 23081SK 2 26mW x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 11 REAR PANEL ASSEMBLY 1x required 43B 43C 43B SNAPT TE i SNAPT TE i 54B 81D ...

Page 12: ...Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 23081SK 2 26mW x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 12 SIDE PANEL ASSEMBLY 2x required X4L X4R SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i 61B 81J ...

Page 13: ...Industries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 23081SK 2 26mW x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 13 ROOF PANEL ASSEMBLY 43D 43D 43D SNAPT TE i SNAPT TE i 81C 88B 81C 88B ...

Page 14: ...sembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 23081SK 2 26mW x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 14 FRONT PANEL ASSEMBLY 89B 89A 32A 32A 54A 79B 54C 90B SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i ...

Page 15: ...W x 0 78mD x 1 80mH 1 95mH Model 23081SK 11 11 19 1 1 15 DOOR PANEL ASSEMBLY Vertical door channels are installed in the opposite orientation compared to the horizontal door channels Short flange of channel Long flange of channel SINGLE DOOR 58C 58C SNAP T TE i SNAP T TE i 12A B B 58B 58A ...

Page 16: ...OTE The two holes required to connect the padbolt hasp for each door have not been pre punched to allow for proper alignment position each hasp centrally over the padbolt shaft and drill 3mm holes and secure with screws NOTE NUTS AND BOLTS SUPPLIED MAY BE USED INSTEAD OF POP RIVETS SUPPLIED BY SIMPLY ENLARGING THE HINGE HOLE SETS IN THE JAMB USING A 4MM DRILL BIT 91A 91A B B ...

Page 17: ...5mH Model 23081SK 11 11 19 1 1 17 PANEL CONSTRUCTION NOTE Take care to ensure that all wall panels are not upside down The top channels of each panel are pre punched for attaching roof sheeting The base channels are not pre punched SIDE WALL PANEL CHANNELS FIT INTO THE NOTCHED FRONT AND REAR WALL PANEL CHANNELS ...

Page 18: ... 11 19 1 1 18 FINAL CONSTRUCTION Each anchor consists of one nut bolt M10 dynabolt and steel angle Drill a 10mm hole into the wall sheet Drill a 10mm hole into the concrete Bolt and Nut M10 4 6 S Steel Angle 35 x 35 x 3 M10 Dynabolt Denotes hot dip galvanised finish Wall Sheet Slab Location of 8 concrete anchors ANCHORING OF SHED ...

Page 19: ... the installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that the construction does not interfere with any of those services 8 G During installation on site the shed structures shall be maintained in a stable condition with no part becoming overstressed or permanentl...

Page 20: ...the relevant provisions of AS1562 Steelwork 1 F The supporting slab foundation for the garden shed shall be of a minimum size indicated on the installation manual The top surface of the formed slab shall be level and free of any irregularities which would inhibit the installation of the shed 2 F The structural engineering design for the supporting slab foundation shall be undertaken by a suitably ...

Page 21: ... wheelbarrows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked above the concrete floor on timber slats Waterproof sealants may be used to offer further protection where required around joins and screw fixings as can rubber door seals and other products w...

Page 22: ...sts The benefits given by the warranty are in addition to your other rights and remedies under a law in relation to the goods or services to which the warranty relates The warranty applies to the exclusion of all other representations guarantees or warranties express or implied our goods come with guarantees that cannot be excluded under the Australian consumer law and is not transferable You are ...

Reviews: