background image

Add: 

1501 Industrial Way N, Toms River, NJ 08755   

Phone:

 866-222-8866   

E-mail: [email protected]

   

 

Web:

 www.aboveallLighting.com  ©2016 ABOVE ALL. Inc. All rights reserved

VISION LED STRIP

Instructions Manual

1

READ CAREFULLY BEFORE INSTALLING FIXTURE. PLEASE KEEP THIS MANUAL FOR FUTURE USING.

Fixtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper

grounding is required for safety.

THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICATION CODE BY A PERSON

FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS

INVOLVED.

MAKE CERTAIN POWER OFF BEFORE INSTALLING OR MAINTAINING FIXTURE.

CHECK THAT VOLTAGE IS COMPATIBLE WITH FIXTURE DRIVER, USE APPROVED CONNECTORS FOR

ALL ELECTRICAL CONNECTIONS.

WARNING:

SUITABLE FOR MODEL

WIRE CONNECTION

RISK OF ELECTRICALSHOCK

• Turn off electrical power at fuse or circuit breaker box before wiring fixture to the power supply.

• Turn off the power when you perform any maintenance.

• Verify that supply voltage is correct by comparing it with the luminaire label information.

• Make all electrical and grounded connections in accordance with the National Electrical Code and any applicable 

   local code requirements.

• All wiring connections should be capped with UL approved wire connectors.

SAFETY INSTRUCTION:

CAUTION:

RISK OF INJURY

• Wear gloves and safety glasses at all times when removing luminaire from carton, installing, servicing or

performing maintenance.

• Avoid direct eye exposure to the light source while it is on.

• Account for small parts and destroy packing material, as these may be hazardous to children.

CAUTION:

RISK OF FIRE

• Keep combustible and other materials that can burn away from luminaire and lamp/lens.

• MIN 90°C SUPPLY CONDUCTORS.

WIRE CONNECTION

Universal voltage driver permits operation at 120V thru 277V,  347V, 50 or 60Hz

a. Connect the voltage supply Line to our AC-L lead

b. Connect the voltage Neutral supply to our AC-N lead

c. Connect the green/yellow ground lead to the supply ground lead

Reviews: